YONGLIJIATOOLING BY HONGHEWEI

TOOL DEVELOPMENT & MANUFACTURE / HW6368

Rear bracket die casting tool

Quality checks across tooling and trials.

The customer specified porosity limits for critical areas of the rear bracket. This two-cavity project shows our tooling scope and how mold-base measurements, assembly checks and T0 sample observations support engineering review.

Two-cavity tooling, guide pillars and cooling connections at the trial setup
HW6368 · tooling and cooling connections at the trial
CASTING MATERIAL

Aluminium alloy

TOOL LAYOUT

Two cavities

CAVITY & CORE INSERTS

8418 tool steel

STAGE SHOWN

Tool inspection & T0 trial

01

The quality requirement

Beyond support and assembly location, internal quality in critical areas matters.

The rear bracket provides support and assembly location. The customer defined porosity requirements by area, with the following limits for critical areas.

CUSTOMER REQUIREMENT · CRITICAL AREAS
Pore density
≤ 1 pore / 3 mm²
Maximum pore diameter
≤ 0.5 mm

These are inspection requirements, not measured results reported on this page.

Our tooling scope

Our scope covered engineering review, DFM and mold-flow analysis, tool design and manufacture, trials, modification and inspection. The cavity and core inserts use 8418 tool steel. The following sections examine the project’s quality work at two levels: the tool itself and the T0 trial.

02

Inspecting the tool

Tool dimensions, fits and movement are an important part of quality review.

The mold-base inspection record pairs design dimensions with measured values. The tooling checklist covers the mold base, inserts, components and assembly—from plates and holes to parting surfaces, cooling circuits, die-closing guides and ejector components.

Mold base
Overall dimensions, clamping slots, holes, guide fits and cooling-port identification.
Die inserts
Parting and cavity surfaces, water-circuit continuity, ejector-pin fits and insert assembly codes.
Components and standard parts
Screw lengths, cooling-pipe assembly, and identification of spare insert pins and ejector pins.
Assembly
Die closing and guide fits, ejector-component positions, movement of fitted parts and lock-plate assembly.
View selected mold-base measurements
Selected dimensions (mm); each set is length × width × height
PartRequired (mm)Measured (mm)
A plate540 × 520 × 146.8540.08 × 520.06 × 146.84
B plate540 × 520 × 139.8540.09 × 520.08 × 139.83
Support block480 × 120 × 110480.06 × 120.07 × 110.04

This extract presents design requirements and measurements without a tolerance-conformance assessment.

03

Evaluating the T0 trial

Read the tooling setup, die-surface temperatures and sample observations together.

The T0 records include cooling-water inlet and outlet connections for the fixed and moving die halves, thermal images after spraying and samples from both cavities. Tool inspection addresses dimensions and fits; trial records show the setup in use and the condition of trial samples.

Die-surface temperatures after spraying

Thermal images show how temperature varies across the die surface, retaining the measurement points and colour scales. These two views use different ranges and should each be read against their own scale.

Die-side view one after spraying, with the original temperature scale and measurement points
Die-side view one · thermal image after spraying
Die-side view two after spraying, with the original temperature scale and measurement points
Die-side view two · thermal image after spraying

From the two-cavity samples to internal observations

The trial castings retain their runners and overflows. Front and side X-ray views provide a further look at internal structure, relevant to the customer’s concern about porosity in critical areas.

Two rear bracket trial castings with runners and overflows
T0 castings from both cavities · identifying marks concealed
Front X-ray view of two rear bracket samples, with central identifying marks concealed
Front X-ray view · central identifying marks concealed
Side X-ray view of two rear bracket samples
Side X-ray view

The images show the observations. Pore counts, pore sizes and compliance with the customer’s limits require a corresponding quantitative inspection result.

04

The project stage shown

Tool inspection and T0 trial records provide a basis for further technical review.

This case shows work from mold-base measurements, fits and assembly checks to T0 temperature and internal sample observations. Maintenance instructions accompany the project, covering installation and cooling connections, preheating, removal of aluminium residue from parting surfaces, and periodic insert and core-pin upkeep.

This case focuses on engineering records from tool inspection and the T0 trial stage.